Teaching Center Foundation and Plumbing #1

Sandra Scallan, Reichel, Claudette Hanks

Copper pipe fittings via crimping tool, without torch

Layer of coarse gravel provides capillary break between ground and slab

Post tension cable system for expansive soil conditions – to limit width of any slab cracks (Post Tension Slabs)

Termite soil treatment (Termidor) – first line of termite protection

Durable moisture barrier (Vapor Block 6 by Raven) under slab and grade beams to prevent wicking ground moisture

Spraying second termite treatment on teaching center

Teaching Center Foundation and Plumbing #1