Shandy Heil, Attaway, Denise, Johnson, Sheldon G.
There are risks and requirements involved in self-contracting. Building your own home almost never ends up costing less than you anticipated. There almost always will be extra costs associated with something that happens as a result of mistakes made, or unforeseen situations that require additional work. The risk can cost you more than what it is worth. Risks and requirements include:
Arranging for Financing
This can be a very difficult process even if you think you have enough money for the initial cost and down payment. You need to be prepared for things such as increases in materials and labor costs. Most mortgage companies will not cover these types of cost increases even if construction has begun. Most lenders will only lend self contractors 80 percent of the projected cost of the project. Costs such as drawing plans, specifications of the property, material costs, and labor costs must be provided to the lender.
Managing the Construction Job
Besides managing your money you will have to manage your time. This task can put tremendous stress on you. You should be prepared to spend at least 30 hours per week for about five to six months. You should ask yourself, "Will my employer allow me enough flexibility to spend this amount time away from my job?" It is important to know issues such as labor laws, general health and safety obligations, code of practice laws, the 2006 International Residential Code and specific regulations for construction.
Insurance
You should carry insurance because you will be just as liable as your subcontractors for any accidents or incidents that occur. If your subcontractors have insurance, they will be covered, but not you. Your insurance should cover such things as, accidents, theft of materials and equipment, materials in transit or at a temporary location, providing coverage for vandalism, and coverage for losses due to change in laws or ordinances.
Types of insurance include:
Licensing Requirements
A homeowner is exempt from having a license to build his own home. If he acts as the contractor, he must occupy the house for at least one year upon completion of the house. When selecting a subcontractor, make sure the subcontractor is reputable and knows Louisiana building laws. Make sure the contractor adheres to the laws involving workman’s compensation, general liability, and laws governed by the Louisiana Department of Revenue.
Selecting and Scheduling Subcontractors
It is important to keep your construction as close to schedule as possible. Delays can push your construction beyond your bank draw causing the bank to take action. When selecting and scheduling your subcontractors, remember they may have others jobs in progress besides yours. Their loyalty may be to those builders who give them jobs on a daily basis. Ask yourself, will they be available when I need them? Will they come when they are scheduled to come? This is important because one job might be delaying numerous jobs. Remember these time components:
Warranty of Work
The New Home Warranty Act requires the builder of a new home to provide certain warranties that extends over a period of one, two, or seven years depending on the nature of the defect. If you build your home and sell it to another person, you will be responsible for any legitimate defects within that seven year time frame. If you die, your estate will be responsible for any claims within that period.
Permits
A building permit and other permits are required even if you are building your own home. Make sure you have the proper permits for all the work needed. Know the zoning ordinances for your area. Periodic inspections are required by the local inspection department and the lender. If you are not familiar with the whole process from start to finish, meet with your local permit official and find out how much commitment is needed in undertaking this project.
Maintenance
Keeping your jobsite clean and having a dumpster on site is required according to most local codes. An unkept site is a safety hazard to your workers and others who need to come to the site. Before the final inspection or Certificate of Occupancy is given the site must be cleaned and ready for landscaping.
Audio clip: What part of self-contracting will be the hardest to learn?