Teaching Center Foundation and Plumbing #1

Sandra Scallan, Reichel, Claudette Hanks  |  3/23/2005 1:46:26 AM

Copper pipe fittings via crimping tool, without torch

Layer of coarse gravel provides capillary break between ground and slab

Post tension cable system for expansive soil conditions – to limit width of any slab cracks (Post Tension Slabs)

Termite soil treatment (Termidor) – first line of termite protection

Durable moisture barrier (Vapor Block 6 by Raven) under slab and grade beams to prevent wicking ground moisture

Spraying second termite treatment on teaching center

Teaching Center Foundation and Plumbing #1