OVE Advanced Framing #1

Sandra Scallan, Reichel, Claudette Hanks  |  6/10/2005 8:54:30 PM

OVE Advanced Framing

Two-stud and 3-stud corners leave room for insulation and eliminate lumber for non-structural use (will use drywall clips)

Interior wall details allow access for installing insulation

(2x6 studs spaced 24 inches o.c.) stack framing, efficient details with borate-treated pine – similar cost as conventional framing, yet higher performance

OVE

OVE

OVE Advanced Framing #1
Rate This Article:

Have a question or comment about the information on this page?

Innovate . Educate . Improve Lives

The LSU AgCenter and the LSU College of Agriculture

Top