Teaching Center Foundation and Plumbing #1
| | Copper pipe fittings via crimping tool, without torch |
| | Layer of coarse gravel provides capillary break between ground and slab |
| | Post tension cable system for expansive soil conditions – to limit width of any slab cracks (Post Tension Slabs) |
| | | Termite soil treatment (Termidor) – first line of termite protection |
| | Durable moisture barrier (Vapor Block 6 by Raven) under slab and grade beams to prevent wicking ground moisture |
| | Spraying second termite treatment on teaching center |
|
|
| Last Updated: 12/19/2011 10:20:40 AM |
More information on Family and Home
|
Please click a number to rate this article:
|
Have a question or comment about the information on this page? Click here to contact us. |
|
|
|